Skip to content
Pack Creek Fire EWP

Pack Creek Fire EWP

Moab, Utah

Following severe flooding and post-fire impacts from the Pack Creek Fire, Grand County partnered with Jones & DeMille Engineering to restore channel stability and protect infrastructure.

Funded through the NRCS Emergency Watershed Protection program, the project included debris removal, bank stabilization, riprap energy dissipation, and construction of a vented low-water crossing on Stocks Drive.

These improvements restored channel function, reduced flood risk, and improved resilience for surrounding properties and transportation routes.

  • Service Area Environmental
  • Location Moab, Utah